ICIEVE 2019 Conference

An integrated group maintenance scheduling with production planning on single machine batch scheduling problem to minimize total actual flow time
Rinto Yusriski (a)*, Budi Astuti (a), Nafia Rianti (a), Zahedi (b)

(a) Department of Industrial Engineering, Faculty of Engineering, Universitas Jenderal Achmad Yani (UNJANI), PO. BOX 807 Bandung Indonesia.
*yusarisaki[at]yahoo.co.id
(b) Department of Mathematics, School of Computer Science, Binus University, Syahdan
Street 9, Jakarta 11480, Indonesia


Abstract

The problem situation can be observed when the capability of several components on a single machine decrease during the scheduling period and need maintenance action. Since the lifetime is variation, that action often interrupts the production process. The solution can be obtained by grouping the maintenance action with determine the number of the group, component on the group, and scheduling the group to the shop. However, that decision must consider the production plan, i.e., the number of the batch, batch size, and schedule the batches. We propose the algorithm to integrate between both of these two problems, so the total actual flow time minimize. The result of experiments shows that the proposed algorithm could increase the performance effectively.

Keywords: group maintenance; batch scheduling; actual flow time

Topic: Industrial Engineering

Link: https://ifory.id/abstract-plain/GuqeKMUfbh3J

Web Format | Corresponding Author (Rinto Yusriski)