Improvement of Dredging Project Planning with Maturity Model of Lean Project Planning and Control Approach
Kennya Novya Putri Nugroho (a*), Moses L. Singgih (b)
Department of Technology Management, Faculty of Business & Technology Management, Sepuluh Nopember Institute of Technology (ITS)
Jalan Raya ITS, Keputih, Sukolilo, Surabaya
*kennya.18092[at]mhs.its.ac.id
Abstract
Project planning has a high level of uncertainty in execution so it needs to be controlled and good planning in every process. The Maturity Model (MM) approach is used to measure the level of development in project planning, and that level is measured by maturity level to determine project planning at which level of MM. In this research, the MM method is implemented together with waste identification of project activity at the executing stage which has not been done before by other researchers. Waste Identification is introduced to find out the reason why project planning is at that level. The purpose of this study is to eliminate waste and identifying the level of maturity will increase the maturity level of planning so the MM level will go up and project more developed. The dredging project was taken as a research object because it has an iterative process, so the lean method can be used. Researchers use MMLPPC to measure the maturity level of project planning. After that, identifying project activities waste during the execution stage using WAM and VALSAT methods. The results are to recognize the maturity level of project planning to go to the next level and make an improvement to develop the next project.
Keywords: Project Management; Maturity Model; Lean; Waste; Dredging; VALSAT
Topic: Operation Management
Link: https://ifory.id/abstract-plain/eRQqfPV2bGMm
Web Format | Corresponding Author (Kennya Novya Putri Nugroho)