ICIEVE 2019 Conference

Development of Work Breakdown Structure Standard for Safety Planning on Railway Construction Work Based on Risk
Zahra Karima(a*), Yusuf Latief(b)

(a)Departement of Civil Engineering, University of Indonesia, Depok, West Java, 16424, Indonesia

(a)zahrakarima[at]rocketmail.com
(b)latief73[at]eng.ui.ac.id


Abstract

In Indonesia the level of work accidents is quite high where every 100,000 workers there are 20 workers who are fatal victims. Work accidents basically can be anticipated if the activities on the project can be well defined and work packages can be placed according to level and level using standardized WBS. The aim of this study is to develop a risk-based WBS standard for safety planning in Railway construction. The results of this study are WBS standards, implementation methods, activities, resources, potential hazard risks and safety planning using risk-based WBS standards on Railway construction work, as an effort to prevent, reduce or eliminate or even cancel the risk of accidents during construction in Railway construction work.

Keywords: WBS; Railway; Risk Management

Topic: Civil Engineering

Link: https://ifory.id/abstract-plain/qxC3dYNZnGbA

Web Format | Corresponding Author (ZAHRA KARIMA)