ISAMME 2019 Conference

Flow Shop Scheduling To Minimize 3-Machine and n-Job Rental Costs by considering Job-block criteria
Muhammad Faudzi Bahari (a*), Sudradjat Supian (b), Eman Lesmana (b)

a) Master program in Mathematics, Faculty of Mathematics and Natural Sciences, Universitas Padjadjaran, INDONESIA
*mfaudzibahari[at]gmail.com
b) Department of Mathematics, Faculty of Mathematics and Natural Sciences, Universitas Padjadjaran, INDONESIA


Abstract

This study discusses a method for flowshop scheduling on 3-machines with n jobs. The purpose of this study is to minimize the cost of leasing machines that must be issued by a company in the production process carried out. The several things considered are the existence of the job-block criteria in the production scheduling process.

Keywords: Flowshop, Minimize Rental Cost

Topic: Applied Mathematics

Link: https://ifory.id/abstract-plain/LWp8Fm4YtXqA

Web Format | Corresponding Author (Muhammad Faudzi Bahari)