Multiple Item Batch Scheduling Model on A Batch Processor to Minimize Total Actual Flowtime Parts Through The Shop
Nita P.A Hidayat (1), Anita Oktaviani T.D (2), Abdul Hakim Halim (3)
1) Industrial Engineering, Bandung Islamic University, Jl. Taman Sari no 1 Bandung, Indonesia
* nita.ph[at]gmail.com
2) Industrial Engineering, Sahid University of Surakarta, Jl. Adi Sucipto no 154 Solo, Indonesia
3) Industrial Engineering, Bandung Institute of Technology, Jl. Ganesha Bandung, Indonesia
Abstract
Keywords: Batch Scheduling, Batch processor, Actual Flow Time
Topic: Industrial Engineering
Link: https://ifory.id/abstract/AeGZKqbxEfhv
Conference: The Third International Conference on Innovation in Engineering and Vocational Education (ICIEVE 2019)
Featured Events
Embed Logo
If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):
<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>
Site Stats