Indonesia Conference Directory


<< Back

Development intelligence scheduling system for flow shop scheduling problem n-jobs
Yusraini Muharni

Industrial Engineering Department of Engineering Faculty Universitas Sultan Ageng Tirtayasa, Jalan Jend. Sudirman Km 3 Cilegon Banten Indonesia 42435


Abstract

Production scheduling problem is arising when a company need to allocate several jobs into limited resources. The problem is related to sequencing the creation or execution of the product as a whole for a number of available machines. This research focus on developing intelligence scheduling system for flow shop scheduling problem n job m machine by applying both heuristic and metaheuristic approch consists of Longest Processing Time (LPT), Shortest Processing Time (SPT), Particle Swarm Optimization (PSO) and Ant Colony Optimization (ACO). The measure of performance of the scheduling is makespan. The Intelligence Schedulling System was designed using MATLAB software programming. The System is tested in Flow Shop Scheduling Problem with configuration of 5 Jobs and 7 Machines. The result shows that the either heuristic approach and metaheuristic approach can run smoothly when solving the scheduling problem in the system.

Keywords: FlowShop;Scheduling;PSO;ACO;Makespan

Topic: Industrial Engineering

Link: https://ifory.id/abstract/D4FUcdXfpvng

Conference: Broad Exposure on Science and Technology (BEST 2019)

Plain Format | Corresponding Author (Yusraini Muharni)

Featured Events

<< Swipe >>
<< Swipe >>

Embed Logo

If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):

<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>

Site Stats