Validation of the Linear Method in the Cascade Reservoir System for Energy Production Predictions, for Suply and Demand Optimization (Case study: Saguling Reservoir, Cirata, Jatiluhur Indonesia)
Empung (a*), I Nyoman Norken (b), Mawitri Infantri Yekti (c), I Gusti Agung Adnyana Putera (d)

a*Departemen Of Civil Engineering, Engineering Faculty, Siliwangi University
b,c,d Department of Civil Engineering, Faculty of Engineering, Udayana University, Bali, INDONESIA


Abstract

In Citarum River, West Java, Indonesia, there are three serial reservoirs successively spreading out from upstream to downstream, namely Saguling Reservoir with the volume of 875 million m3and electrical energy production of 700 MW, Cirata Reservoir with the volume of 2,156 million m3 and electrical energy production of 500 MW, and Jatiluhur Reservoir, the most downstream, with the volume of 2,451 million m3 and electrical energy production of 150 MW. Jatiluhur Reservoir also provides supply for irrigation of 260,000 ha areas and drinking water industry with average inflow of 100m3/s. Those reservoirs have highly fluctuated with maximum water level 5 m per month. This condition occurs as sharing-non-sharing system is applied. Although this fluctuation is still in a normal condition, it affects the stability of reservoir slope. This study discusses about the validation of linear method to reach an optimal value of reservoir production in terms of electrical energy. The primary reservoir inflow data used was from 1988-2000, while the demand data was taken from 1992-2000, Cascade reservoir technique data was based on the existing data in 2000, Stochastic analysis was used to determine the inflow of 2000-2005 generation, while demand analysis was carried out using regression analysis. Multi-reservoir optimization analysis is carried out with linear simulation programs to obtain energy or fulfillment of demand every month, while demand for irrigation in the Jatiluhur reservoir is needed as a top priority supported by Saguling, Cirata and Jatiluhur reservoirs as the next priority. The result of optimizing cascade reservoir from 2001-2005, with initial period of operation on April obtained an average electrical production of 4,996.5 GWh, shows that the realization of average electrical production is 4,141.96 GWh. Besides, the average of demand is 4,996.8 MCm while the average supply is 5,806.2 MCm.

Keywords: Optimization, Multi Reservoir Operation, Purpose Function, Predictions.

Topic: International Symposium of Civil, Environmental, and Infrastructure Engineering

Link: https://ifory.id/abstract/FPtBXCrATneN

Conference: The 3rd International Conference on Sustainability and Innovation (ICoSI 2019)

Plain Format | Corresponding Author (Empung -)

Featured Events

<< Swipe >>
<< Swipe >>

Embed Logo

If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):

<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>

Site Stats