Indonesia Conference Directory


<< Back

Initial Prototype of Power Plant Based on River Currents Prime Mover (Design and Testing)
Yusran (a*), Irfan Fatahuddin (a), Christoforus Yohannes (b)

a) Department of Electrical Engineering, Universitas Hasanuddin
b) Department of Informatic Engineering, Universitas Hasanuddin
Jalan Poros Malino km 6, Bontomarannu, Gowa, Sulawesi Selatan, Indonesia
*yusran[at]unhas.ac.id, yusranibnu[at]yahoo.com


Abstract

The river currents is one of renewable energy types. It can be utilized for electrical generation. This study discusses about design and testing of initial prototype of power plants based on river currents prime mover. The working principle of this prototype is to convert kinetic energy from water current into electrical energy. The prototype testing were carried out at several variations of river currents velocity : 0.6, 0.8, 0.9, 1.2 and 1.3 m/s. The testing at 1.3 m/s velocity produced 1300 rpm generator rotational speed, 0.22 A of electrical current and 14.6 V electrical output voltage.

Keywords: : initial prototype, hydro power plant, river currents, prime mover, electrical power

Topic: Renewable Energy

Link: https://ifory.id/abstract/GRnmJWcuHCh6

Conference: The 2nd International Conference on Global Issue for Infrastructure, Environment, and Socio-Economic Development (GIESED 2019)

Plain Format | Corresponding Author (Yusran Yusran)

Featured Events

<< Swipe >>
<< Swipe >>

Embed Logo

If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):

<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>

Site Stats