CONTROL OF SUSTAINABLE PROJECTS IN JAKARTA INFRAKOM BUILDING USING EARNED VALUE ANALYSIS
Dr. Tukhas Shilul Imaroh, MM, Tatang Setiawan

Universitas Mercu Buana


Abstract

This research aims to control the time delay in the potential for increased costs made by the concept of earned value analysis method. Secondary data collection includes Time Schedule (S-Curve), Budget Plan, weekly progress progress report and monthly project progress report. Primary data are company profile and profile of Infracom office building project. The method used in cost and time control strategies is to use the concept of earned value analysis. Management of time and cost control in the Infracom Jakarta Central Office Building Project is effective and efficient to determine the performance of project performance related to the accuracy of completion time and cost prediction up to the end of the project and time and cost performance performance will be monitored regularly and project projection known early on so that with these conditions preventive steps and follow-up actions or corrective actions can be taken in the event of a discrepancy between the plan and the realization of project implementation.

Keywords: cost and time control, earned value analysis

Topic: Operation and Flexibility Management

Link: https://ifory.id/abstract/UYxBZEeb7Qd6

Conference: The 4th International Conference On Management, Economics And Business (ICMEB 2019)

Plain Format | Corresponding Author (Tukhas Shilul Imaroh)

Featured Events

<< Swipe >>
<< Swipe >>

Embed Logo

If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):

<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>

Site Stats