Scheduling Evaluation In Construction Projects Using The Critical Chain Project Management Method
Nurhayati Sembiring, Andre Putra

Department of Industrial Engineering, Faculty of Engineering, Universitas Sumatera Utara,
Jalan Almamater Kampus USU, Medan, Indonesia 20155
nurhayatipandia68[at]usu.ac.id
andreputraa26[at]gmail.com


Abstract

PT. A is a company engaged in construction, EPC (Engineering, Procurement and Construction), infrastructure investment, property and real estate. The case study that was raised in this study was the construction project of the retaining wall and the ABC dock that was carried out by PT. A. The problem in the project is that the project scheduling is not good, causing delays in project completion. The purpose of this research is to evaluate the scheduling of the project so that the optimum schedule can be obtained in project implementation. The method used in this study is Critical Chain Project Management (CCPM). This project scheduling method that can optimize the schedule due to the absence of multitasking.The critical path serves to find out the critical or non-critical work or activity.

Keywords: Project Management;Critical Chain Project Management;Scheduling

Topic: Industrial Engineering

Link: https://ifory.id/abstract/b8jRzAqnT3eW

Conference: The Third International Conference on Innovation in Engineering and Vocational Education (ICIEVE 2019)

Plain Format | Corresponding Author (NURHAYATI SEMBIRING)

Featured Events

<< Swipe >>
<< Swipe >>

Embed Logo

If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):

<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>

Site Stats