Indonesia Conference Directory


<< Back

Application of Subcontractor Selection Using Analytical Hierarchy Process Method in Ritz Garment
Muthia Ramadhani (a*), Yuanita Handayati (b)

a,b) School of Business and Management, Institut Teknologi Bandung
Jl. Ganesha no. 10, Bandung 40132, Indonesia
*muthia.ramadhani[at]sbm-itb.ac.id


Abstract

As the garment industry increases, subcontractors are needed to help companies fulfill the demand that cannot be met. To manage subcontractors to keep the quality of the products, subcontractor selection should be conducted to ensure subcontractors that are selected to cooperate are able to meet the company-s requirement. One of the methods that can be used to conduct subcontractor selection is Analytical Hierarchy Process (AHP) method, which is s decision-making method that is used when there are various criteria that have to be considered. This research is an application of subcontractor selection that is conducted in Ritz Garment, which is a garment manufacturer, using AHP method. This research aims to determine the level of importance of the criteria and sub-criteria that are used for subcontractor selection for Ritz Garment, assess the performance of current and alternative subcontractors, and provide recommendation for Ritz Garment based on the subcontractor selection. To determine the importance of the criteria and sub-criteria and also to score alternatives towards each of the sub-criteria, decision makers are interviewed to get their expert judgement. From the result of this research that is conducted using AHP method with the Expert Choice software, level of importance for each criterion and alternatives are obtained. The order of importance of criteria is Quality (0.296), Cost (0.290), Reliability (0.273), Delivery (0.080), and Flexibility (0.061). The sequence for sub-criteria Global Weight is Defect Rate (0.156), Trustworthy (0.154), Internal Cost (0.153), Conformance Quality (0.140), Product Price (0.137), Product Reliability (0.119), Customization (0.051), Compliance with Quantity (0.045), Compliance with Schedule (0.035), and Product Volume Changes (0.010). For the alternatives, the order of importance is Alternative Subcontractor 1 (7.667), Alternative Subcontractor 2 (0.7.314), Alternative Subcontractor 3 (7.099) and Current Subcontractor (6.266). From the result, it is concluded that Alternative Subcontractor 1 is the best subcontractor to replace Current Subcontractor.

Keywords: garment industry, subcontractor selection, analytical hierarchy process, criteria, sub-criteria, best subcontractor, case study

Topic: Management

Link: https://ifory.id/abstract/jxKwzCPmQZNp

Conference: International Conference on Economics, Business and Economic Education Science (ICEBEES 2019)

Plain Format | Corresponding Author (Muthia Ramadhani)

Featured Events

<< Swipe >>
<< Swipe >>

Embed Logo

If your conference is listed in our system, please put our logo somewhere in your website. Simply copy-paste the HTML code below to your website (ask your web admin):

<a target="_blank" href="https://ifory.id"><img src="https://ifory.id/ifory.png" title="Ifory - Indonesia Conference Directory" width="150" height="" border="0"></a>

Site Stats